Construction Site

Pre‑Treat Construction and Final Treatment in Boca Raton, Florida

Stop Termites Before They Start

Lay the groundwork for termite-free construction with proven pest management and prevention.

 

Pre-construction termite treatment is a preventative applied during the early construction phase, usually before the concrete slab is poured. It targets the soil and structural gaps where termites first enter, creating a protective barrier beneath and around the foundation walls.

 

This early defense helps prevent termite infestations from taking hold in framing, drywall, and subfloors and wreaking significant damage to your structure. In South Florida, where subterranean termites are aggressive and active year-round, termite pretreatments are one of the most effective ways to protect a structure long before signs of damage appear.

pre-construction.png

How Our Pre-Construction Termite Treatment Process Works

To lock out subterranean colonies before they take hold, our pre-construction termite treatments embed advanced liquid termiticide and soil barriers into every stage of slab construction. The proactive termite control method builds termite protection into your foundation, safeguarding framing elements and critical support piers long before any signs of infestations appear.​

1. Strategic site assessment

We review your building plans and inspect soil adjacent to foundation elements—form boards, bath traps, and crawl-space entries—to pinpoint termite activity and risks before slab construction begins.

 

2. Trench & injection application

Licensed technicians trench along the exterior perimeter and inject liquid termiticide into treated soil beneath slab areas, creating continuous vertical and horizontal barriers that block eastern subterranean termites at the soil–wood interface.

 

3. Lumber & void protection

Key structural components, such as floor joists, pressure-treated studs, sill plates, and support piers, receive a precise rodding application to seal wall voids and protect cellulose materials from pest ingress.

 

4. Compliance verification & final grading

After concrete placement and backfill, we verify barrier continuity, moisture levels, and adherence to local building codes. Any remaining gaps get a supplementary soil treatment for comprehensive termite prevention and long-term structural protection.